Vidhi Dyestuffs to manufacturer food color unit at Dhatav in Roha Taluk in Raigad district of Maharashtra with an investment of Rs. 27.5 million. The product proposed to be manufacture will be food colours(100MTPM) and lake colours (50MTPM). The new unit will manufacture the following food colors.
1. Food Colours
Tartrazine
Sunset yellow
Ponceau 4 R
Carmoisine
2. Lake Colours
Lake brilliant blue
Lake Amaranth
Lake Carmosine
Lake erythrosine
Lake ponceau 4R
Lake sunset yellow
Lake tartrazine
Lake Pea green
Lake Quinolin Yellow
Lake Apple Gran
Lake Indigo Blue
Lake Indigo Carmine
Lake Allura Red
Sekhsaria Chemicals to expand its manufacturing facilities located at Anand Nagar, Ambernath (E) in Thane district of Maharashtra. The total project cost is estimated at Rs. 350 million. The company is to manufacture the following products at the new unit.
Sr. No. | Particulars | Existing (MTA) | Proposed (MTA)
|
1. | Anti-inflammatory Drugs/Analgestic Drugs/Antipyretic Drugs | 10 | 233 |
2 | Anxiolytic Drugs/Antisychotic Drugs/Anticonvulsant Drugs | 5 | 14 |
3 | Antidepressant Drugs/Anaesthetics Drugs | 6 | 34.5 |
4 | Antiparkinsonian Drugs | 2 | 17 |
5 | Antispasmodic Drugs | -- | 1 |
6 | Antiacne Drugs/Antipsoriatic Drugs | -- | 4 |
7 | Immunomodulator Drugs | -- | 2 |
8 | Antihypertensive Drugs/Antianginal/Antiarrythmic Drugs | 8 | 22 |
9 | Antiulcerative Drugs | 2 | 9 |
10 | Antibacterial Drugs | 5 | 29 |
11 | Antihyperliproteininemic Drugs | 9 | 40 |
12 | Antihistaminic Drug | 3 | 15 |
13 | Antipneumocystic | -- | 5 |
14 | Antithrombotic | 0.5 | 5 |
15 | Antiasthamatic/Decongestant | -- | 4 |
16 | Hemorheologic Agent | -- | 5 |
17 | R&D products | 4 | 5 |
18 | Speciality Chemicals & Intermediates | -- | 50 |
Total 54.5 | 494.5 |
Hikal to expand its pesticides unit at Taloja in Raigad district of Maharashtra. After expansion, the unit will manufacture the following chemicals.
Name of the product | Existing (MTPA) | After expansion (MTPA) |
Thiabendazole | 948 | 700 |
Bifenazate | 300 | 100 |
ADMP | 456 | 200 |
HTP-213 | -- | 300 |
IPDO | -- | 300 |
Intermediates of HTP-293 | - | 200 |
Total | 1,704 | 1,800 |
Total project area is 60,000 m2 and expansion will be carried in 3,000 m2 in the same premises. No additional land will be required. The total project cost is estimated at Rs. 150 million.
Bulk Cement Corportation to expand its Taloja plant in Raigad in Maharashtra. The capacity of the plant is to be expanded from (1.20 MTPA to 1.50 MTPA) and the process will mainly involve blending, grinding and packing process of fly ash, gypsum and clinker. Increase in production capacity of Pozzolona Portland Cement (PPC) will be achieved by installation of fly ash processing with clinker (1.02 MTPA), gypsum (0.025 MTPA) and fly ash (0.45 MTPA). Total water requirement from CIDCO will be 100 m3/d. The total project cost is estimated at Rs. 700 million.
11,950 ₹ | 4950 ₹ | 4950 ₹ | 4950 ₹ | 3950 ₹ |
Copyright © 2013 Ibis Research Information Services Pvt Ltd. All Rights Reserved.
Contact : Ibis Research Information Services Pvt Ltd., 28, Rajaji Street, NGO Colony
Guduvancherry, Chennai -603 202 Mobile : 0-97898-37940 email : [email protected] Privacy Policy